Complete repair of electrical and mechanical part; purification of oil; repair of cooling system; repair of gas relay; repair of regulation system; repair of relay protection system; complete testing; putting into operation.
#02Ongoing
Comprehensive diagnostics and testing of 6/0.4 kV power transformers
“Armenia International Airports” CJSC
Period
2026-ongoing
Technical parameters
630-400 kVA, 6 kV power transformers
Our role
General Contractor
Scope of work
Full testing of the power transformers; identifying the defects; preparing the passports of the transformers; creating the repair methodology.
#03Ongoing
Complete repair of 110/35/10 power transformer
“South Caucasus Railways” CJSC
Period
2026-ongoing
Technical parameters
10 MVA,110/35/10 kV power transformer
Our role
General Contractor
Scope of work
Complete repair of electrical and mechanical part; purification of oil; repair of cooling system; repair of gas relay; repair of regulation system; repair of relay protection system; complete testing; putting into operation.
#04Ongoing
6 kV overhead line reconstruction Phase 3
“GPM Gold” LLC
Period
2026-ongoing
Technical parameters
6 kV OHL
Our role
General Contractor
Scope of work
Existing line dismantling; supply and installation of line components, concrete poles and disconnectors; outdoor switchgear fabrication and installation; earthing, associated civil works and commissioning.
#05Ongoing
Complete repair of 110/10 power transformer
“South Caucasus Railways” CJSC
Period
2026-ongoing
Technical parameters
10 MVA, 110/10 kV power transformer
Our role
General Contractor
Scope of work
Dismantling and transport to repair facility; diagnostics; active-part, tap-changing system, HV bushing, tank, accessories and protection repairs; oil replenishment and treatment; testing; return transport and installation.
#06Completed
Construction of new 0.4 kV substation
“GPM Gold” LLC
Period
2026
Technical parameters
0.4 kV substation
Our role
General Contractor
Scope of work
Supply and installation of 2x1600 KVA, 6/0.4 kV power transformers; manufacturing, supply and installation of 400 V modular panels; assembling of busbar system; installation of earthing system; installation of 6 kV power cables; complex testing of the installed system
#07Completed
Comprehensive diagnostics and testing of 35/6 kV power transformers
“Armenia International Airports” CJSC
Period
2026
Technical parameters
6.3 MVA, 35/6 kV power transformers
Our role
General Contractor
Scope of work
Full testing of the power transformers; identifying the defects; preparing the passports of the transformers; creating the repair methodology.
#08Completed
Repair of power equipment at 6 kV substations
Artashat Water Users Union
Period
2026
Technical parameters
6 kV substation
Our role
General Contractor
Scope of work
Repair of damaged 6 kV power and commutation equipment; installation of power cables; installation of end terminations.
#09Completed
6 kV overhead line reconstruction Phase 2
“GPM Gold” LLC
Period
2025
Technical parameters
6 kV OHL
Our role
General Contractor
Scope of work
Existing line dismantling; supply and installation of line components, concrete poles and disconnectors; outdoor switchgear fabrication and installation; earthing, associated civil works and commissioning.
#10Completed
Construction of new 10/0.4 kV substation
“Ararat Canning Factory” LLC
Period
2025
Technical parameters
10/0.4 kV substation
Our role
General Contractor
Scope of work
Fabrication and installation of MV and LV switchgear and busbars; supply and installation of outdoor lighting; commissioning. MV switchgear supply is also listed in the source.
#11Completed
Construction of new 6/0.4 kV substation
“G-Coder” LLC
Period
2025
Technical parameters
6/0.4 kV substation
Our role
General Contractor
Scope of work
Supply and installation of 630 kVA, 6/0.4 kV power transformer; MV and LV switchgear fabrication and installation; MV cable supply and installation; busbars; commissioning.
#12Completed
6 kV overhead line reconstruction Phase 1
“GPM Gold” LLC
Period
2024
Technical parameters
6 kV OHL
Our role
General Contractor
Scope of work
Existing line dismantling; supply and installation of line components, concrete poles and disconnectors; earthing, associated civil works and commissioning.
Page 1 / 6
Source: project reference list dated 5 November 2026. Ongoing assignments are identified separately.